UT Austin researchers say data centers could reach 3% to 9% of Texas water use by 2040, yet the 2027 State Water Plan leaves AI demand out of its forecasts.

Quick Answer: University of Texas at Austin researchers estimate that data centers, which use less than 1% of Texas water today, could account for 3% to 9% of statewide water use by 2040 once on-site cooling and the water used to generate their electricity are both counted. The Texas Water Development Board adopted its initial 2027 State Water Plan on July 23, 2026 without data center demand projections, citing limited data, and says a fuller accounting will wait for the 2032 plan.

The debate over artificial intelligence infrastructure in Texas has centered on electricity. A second resource question is now moving up the agenda: water. A white paper from the COMPASS research consortium at the University of Texas at Austin’s Bureau of Economic Geology puts numbers on how much water the state’s data center build-out could require, and state water planners have acknowledged that their own 50-year plan does not yet measure it.

How much water could Texas data centers use by 2040?

The white paper, titled “Water Use Requirements for Data Centers in Texas,” was first published in December 2025 and last updated in August 2026. The Jackson School of Geosciences publicized its findings on May 6, 2026. Its headline estimate is that data centers could account for 3% to 9% of Texas water use by 2040, up from less than 1% today. For scale, the university noted that manufacturing accounts for about 7% of state water use under the current state water plan and that thermal power generation uses about 5% for cooling.

The range is wide because it rests on three variables: how fast the industry grows, which cooling technologies operators choose, and which fuels generate the electricity. Mariam Arzumanyan, a postdoctoral fellow at the Bureau of Economic Geology who coordinated the paper, said there is “a lot of uncertainty” surrounding data center water use.

What is the difference between direct and indirect water use?

Direct use is water consumed on site to cool servers. Indirect use is water consumed at power plants to produce the electricity a data center buys. The white paper counts both, and the indirect share is the larger one in its base model. The authors add an important caution: indirect use may already be captured in the Texas Water Development Board’s steam-electric category, so adding the paper’s totals on top of existing sector demand could double count some water.

UT Austin white paper: estimated Texas data center water use (billion gallons, share of statewide demand)
Case Year Direct (cooling) Total (cooling plus power)
Base model 2025 13 (0.2%) 33 (0.6%)
Base model 2030 90 (1.5%) 225 (3.7%)
Base model 2040 139 (2.3%) 348 (5.8%)
ERCOT-adjusted load, 22 GW 2030 36 (0.6%) 91 (1.5%)
Transmission provider reported load, 78 GW 2030 127 (2.1%) 319 (5.3%)

The percentages are measured against the statewide demand baseline in the Texas Water Development Board’s 2022 State Water Plan, which the paper lists as 5,761 billion gallons for the current period, 6,004 billion gallons in 2030 and 5,972 billion gallons in 2040.

Why do the estimates vary so much?

How much data center capacity is actually coming?

The biggest swing factor is how many announced projects get built. The paper’s model assumes 8 gigawatts of existing Texas data center capacity in 2025, in line with other estimates it cites of 8.4 gigawatts and 9.6 gigawatts. For 2030, the gap between sources is enormous: an ERCOT-adjusted figure of 22 gigawatts is less than one-third of the 78 gigawatts reported by transmission service providers. The paper’s own scenarios run from 40 gigawatts in 2030 and 60 gigawatts in 2040 in the low case, to 55 and 85 gigawatts in the medium case, to 70 and 110 gigawatts in the high case.

Counts of facilities show the same momentum. The university’s May release said more than 400 data centers were operating or under construction in Texas. The updated paper notes that the industry tracker Baxtel listed 479 Texas data centers in late 2025 and 766 by August 2026, a count that includes planned and proposed projects.

How much does the power source matter?

A great deal. The paper reports water consumption per kilowatt-hour by fuel: 0.5 to 1 gallon for coal, 0.5 to 0.6 gallons for nuclear, 0.2 to 1.1 gallons for natural gas, and approximately zero for wind and solar photovoltaic generation. Applied to a mid-size facility using 60 million kilowatt-hours a year, that works out to 12 million to 66 million gallons annually on natural gas, and 120 million to 660 million gallons for a large facility using 600 million kilowatt-hours.

The 2025 ERCOT generation mix used in the paper was 33% combined-cycle gas, 23% wind, 14% solar, 13% coal, 8% simple-cycle gas and 8% nuclear, giving a blended consumption rate of 0.37 gallons per kilowatt-hour. That is why the university’s scenarios separate a mainly renewable supply, a mainly thermal supply and a balanced mix.

Which cooling systems use the most water?

Cooling design is the factor operators control most directly. The paper compares primary cooling approaches on energy efficiency (power usage effectiveness, or PUE), water efficiency (water usage effectiveness, or WUE, in gallons per kilowatt-hour) and relative capital cost.

Primary cooling options compared in the UT Austin white paper
Technology PUE WUE (gal/kWh) Relative capital cost
Direct evaporative (adiabatic) 1.15 to 1.35 0.03 to 0.26 1X (baseline)
Indirect evaporative (cooling tower) 1.15 to 1.35 0.46 to 0.66 1X (baseline)
Air (dry) cooling 1.2 to 1.45 0 0.5X
Geothermal, ocean or underground 1.2 to 1.5 0 to 0.01 10X

The trade-off is visible in the table. Dry cooling uses no water and has the lowest capital cost, but its PUE range is higher, meaning more electricity per unit of computing, and in a thermal-heavy grid more electricity means more indirect water. The paper’s base facility case assumes 85% utilization, a PUE of 1.15 and a WUE of 0.25 gallons per kilowatt-hour; its high-efficiency case assumes a WUE of 0.20 and its low-efficiency case 0.35.

How would data centers compare with other Texas water users?

The paper reproduces the state water plan’s sector demands, which give context for the scenarios.

Texas water demand by sector, 2022 State Water Plan, as cited in the white paper (billion gallons)
Sector 2020 2030 2040
Irrigation 3,079 (53.4%) 3,057 (50.9%) 2,836 (47.5%)
Municipal 1,702 (29.5%) 1,898 (31.6%) 2,098 (35.1%)
Manufacturing 436 (7.6%) 499 (8.3%) 499 (8.3%)
Steam-electric power 303 (5.2%) 305 (5.0%) 305 (5.1%)
Mining 132 (2.3%) 133 (2.2%) 119 (2.0%)

Set against those figures, the base-case total of 225 billion gallons in 2030 would be larger than projected mining demand and smaller than steam-electric power or manufacturing. By 2040, the base-case total of 348 billion gallons would exceed the plan’s steam-electric figure of 305 billion gallons. Irrigation and municipal use would remain far larger in every scenario. Data centers would not become the state’s biggest water user; the issue is that a new industrial-scale demand is arriving in a system the state already expects to tighten.

Where in Texas is the pressure greatest?

The paper finds that zones of projected water deficit in West and Central Texas overlap with several announced AI and hyperscale developments. East Texas has surplus water, but infrastructure gaps and permitting constraints limit how much of it can be used.

What does the 2027 State Water Plan say about data centers?

Very little. The Texas Water Development Board released its draft plan on April 16, 2026 and adopted the initial 2027 State Water Plan on July 23, 2026. According to Community Impact’s report on the meeting, the plan’s projections do not account for data center water use or its effect on availability, and the board cited limited data as the reason. On the same day the three-member board denied a petition from a Wimberley resident asking for mandatory standalone demand projections for data centers and cryptocurrency mining operations.

The data gap is concrete. Temple McKinnon, the board’s water planning director, told a legislative hearing on June 23 that of 341 data centers sent water use surveys last year, 83% did not respond. Among completed surveys, surface water made up nearly 90% of data center water use, groundwater 8% and an unknown source 2%. Data centers are required to file annual water use surveys with the board, as all industries are.

The board received more than 1,000 public comments on the draft, the most in the plan’s history, and about 268 addressed data center and cryptocurrency mining water use.

The plan’s own stakes are large even before data centers are added. Its recommended projects would cost about $174 billion over 50 years. Between 2030 and 2080 it expects water demand to rise 6% while existing supplies fall 10%, mainly from aquifer depletion. It estimates that without those projects a severe drought could cost the state $91 billion in economic damages as soon as 2030, with annual losses reaching $177 billion by 2080. E&E News reported that the draft forecast the power sector’s share of state water demand rising to 3.8% by 2030 from 3.5% in 2023.

Board officials have said the omission is not indifference. The final version of the plan is due by Jan. 5, regional plans can be amended at any time as new data arrives, and the agency is expanding its collection and analysis of what it calls high-load digital infrastructure water demands for the 2032 plan. E&E News reported that a board attorney said staff are developing methods to separate data center demand from crypto mining demand. None of the state’s 16 regional planning groups asked for data center-related changes to their demand projections in this cycle.

What could change in the 2027 legislative session?

Regulation of data center water use is a matter for the Legislature; board officials told commenters they lack authority to restrict the industry. Several signals point to action when lawmakers convene in 2027. E&E News reported that Lt. Gov. Dan Patrick’s March 2026 interim charges asked the Senate to study the water demands of energy-intensive technologies including data centers, and that state Sen. Charles Perry of Lubbock, who chairs the Senate Water, Agriculture and Rural Affairs Committee, plans to propose data center water “guardrail” bills. The Public Utility Commission of Texas has also sent developers a voluntary survey on planned water use and sources.

The white paper’s recommendations offer a template: water disclosure and reporting standards that would include WUE, usage caps and reuse incentives, siting tools that combine hydrologic projections with grid schedules and permitting timelines, harmonized permitting across agencies, and greater use of non-potable or reclaimed water where feasible.

What is the industry’s position?

Industry representatives argue that water concerns are often overstated. E&E News quoted the Data Center Coalition pointing to a Virginia legislative audit that found 83% of data centers there used the same amount of water as, or less than, an average large office building in 2023, and noted that most new data centers use air cooling or closed-loop systems. The white paper’s cooling table shows direct water use can be driven close to zero by design, but in its base model the indirect water embedded in electricity is the larger share of the total.

Frequently Asked Questions

How much water do Texas data centers use today?

Less than 1% of statewide use. The UT Austin white paper’s base model puts 2025 direct cooling use at 13 billion gallons and total use, including water for power generation, at 33 billion gallons, or 0.6% of state demand.

Where does the 3% to 9% by 2040 figure come from?

It comes from the COMPASS consortium at UT Austin’s Bureau of Economic Geology. The range reflects different assumptions about industry growth, cooling technology and the fuel used to generate electricity.

Does the Texas State Water Plan include data centers?

Not in its projections. The Texas Water Development Board adopted the initial 2027 plan on July 23, 2026 without data center demand forecasts, citing limited data, and plans expanded analysis for the 2032 plan.

Can the Texas Water Development Board limit data center water use?

No. Board officials said they lack that authority and that the Legislature sets those rules. Lawmakers are studying the issue ahead of the 2027 session.

Sources and Further Reading

  1. Water Use Requirements for Data Centers in Texas (white paper, updated August 2026), COMPASS Research Affiliates Program, Bureau of Economic Geology, University of Texas at Austin
  2. Data Centers Are Growing in Texas, But Big Questions Remain About Water Use, Jackson School of Geosciences, University of Texas at Austin
  3. Texas includes minimal data center info in state water plan, citing limited data, Community Impact
  4. Texas water plan ignores data center surge, E&E News by POLITICO
  5. Texas green-lights water plan lacking data center forecasts, E&E News by POLITICO
  6. Report: Texas data centers may increase pressure on the state’s strained water supplies, KERA News and The Texas Newsroom